CASE STUDIES

Architectural Wind 

Assessment - Carbon

Assessment - Energy

Assessment - Sustainability

Assessment -
Walmart and Carbon

Combined Heat
and Power

Compressor Upgrade

Demand Response


Energy Control

HVAC Upgrade

Lighting – GES Hybrid

Lighting - HIF

Lighting – LED
High Bay


Lighting – LED Retail

Motor Upgrade

Power Factor Correction

Variable Frequency Drive Upgrade 

ENERGY EFFICIENCY

ON SITE & RENEWABLE ENERGY

ENTERPRISE
SMART GRID

CESA FINANCING



ENERGY CONTROL CASE STUDY


SITUATION

EMC Corporation occupies several large office, lab and
assembly facilities on a campus setting in Southborough, MA.
The largest work and lab space in this complex, consisting
of traditional cubicle style work areas, is occupied for only
intermittent periods throughout the business week and is
surrounded on its periphery by large windows which offer
natural sunlight to the interior areas during daylight hours.


PROJECT

Groom Energy’s team performed on-site data logging,
gathering detailed information about occupancy periods
and ambient light levels during a typical work period.
Using this logged data the engineering team identified
a significant energy savings to be gained through adding
networked based lighting controls to this entire workspace.

Through its design Groom Energy delivered an implementation
managing 1,300 lighting fixtures in a more energy efficient
manner. Based on the Metasys NAE building controller this
system utilizes a six-zone, 270 motion and 126 ambient
sensor network, allowing the existing lighting system to
automatically switch off during periods of no occupancy
or dim down when supplementary natural light is present.


RESULTS





Home | Our Team | Markets | Assessments | Solutions | Implementations | Research | News & Events | Blogs | Contact Us